10 Hooks Ceramic Balls Over Door Hanger

US$2.00 - 5.00 1,000 Pieces (MOQ)
Port:
Shenzhen, China
Production Capacity:
120X40hq/Month
Payment Terms:
L/C, T/T, Western Union

Berlee Furniture Co., Ltd.

Guangdong, China

Last Login Date:

Feb 27, 2025

Main Products:

Metal Shelving

Find Similar Products
US$0.10-0.40
500 Pieces (MOQ)

Product Description

Company Info

Basic Info.

Model NO.
CT-7009A
Usage
Sundries, Food, Apparel, Book / Magazine, Tools, Tableware, Shoes
Shape
Rectangular
Style
Original
Material
Folded
Unfolded
Sets
1-3PCS
Finish
Chrome or Powder Coating
Trademark
Frameworkz
Transport Package
12PCS / Master Carton
Specification
48 x 8.5 x 19cm
Origin
China
HS Code
94032000

Product Description

10 Hooks Ceramic Balls Over Door Hanger 

Model No:CT-7009A
Dimensions:48 x 8.5 x 19cm
Finish:chrome / powder coating
MOQ:1000 sets,mix item for 40" container loading

 

   More Items

https://wire-shelving.en.made-in-china.com/product-group/ZbUaCtMoALrX/Folding-rack-catalog-1.htmlhttps://wire-shelving.en.made-in-china.com/product-group/AeYTEONDHupy/Garment-rack-catalog-1.htmlhttps://wire-shelving.en.made-in-china.com/product-group/rqpfRKBxszYb/kitchen-shelf-catalog-1.html

 

 

 

 

Q1. Why Frameworkz ?
You don't have to purchase from our company, We know you could find any lower price in China.
However, if you purchase from us, you will get:

1.Cut out the middleman and drive down cost to provide lower prices to customer.
2.Talk with real manufacturer what you want.
3.As start company,all our products has been passed environmental protection.
4.Tell you how to avoid the dispute for the different markets.
5.Support ODM designs.
6.Get an high durable or much better products.
7.Always get the newest trend in our industry.

Q2: What is your delivery date? 
A1. It's our normal production season, If order qty under 5000pcs:      
Standard products will be taken around 45days from order confirmation (or deposit paid).      
Customized products will be taken around 60days from order confirmation (or deposit paid).      
Over 5000pcs, There will be from 60days to 120days depend on actual qty , quality , article's construction etc.
A2. It's our peak production season, we'll take extra 15-20days base on standard leadtime.

Q3: How can you control your quality ? 
A: Make the pre-production sample for physical properties evaluation.
B: Send PP sample or photos to customer for confirmation.
C:We complete QC system to control each production processing.        
D:Each item has its sole code from raw materials to final processing.          
E:We have guideline to workers for each production processing.        
F:Each workshop has QC conducts random draw and check. Over 20 years Retail Chain Supply experience, Clear know the EU / USA standard.    Work with qualified supplier, strict control the chemical composition.
E.   All the goods conducts final self-inspection before shipment. 

Send your message to this supplier
Mrs. Rachel Lee

Post a Sourcing Request Now

People who liked this also liked