Over Door Hanging Metal Shoe Display Rack

US$7.00
500-999 Pieces
US$10.00
1,000+ Pieces
Port:
Shenzhen, China
Production Capacity:
80X40hq/Month
Payment Terms:
L/C, T/T, Western Union

Berlee Furniture Co., Ltd.

Guangdong, China

Last Login Date:

Feb 27, 2025

Main Products:

Metal Shelving

Find Similar Products

Product Description

Company Info

Basic Info.

Model NO.
FW-318-2
Material
Type
Stand
Layer
4 Layers
Style
Usage
Installation
Floor Mounted
Function
Color
Silver
Condition
New
Surface Finshing
Powder Coating/Chrome
Certification
ISO9001
Trademark
Frameworkz
Transport Package
1PC/Master Carton
Specification
75 x 25 x 85cm
Origin
China
HS Code
9403200000

Product Description

For More Option
 
 
Types of:
Over Door Hanging Metal Shoe Display Rack
package:
1set /master carton
Package size:
15 x 8 x 67 cm
Product Size:
56 x 25 x 130 cm
Advantage:
Easy assembly, creat large storage capacity
service:
Online service
Warranty:
1 year
Maximum load:
15kgs
Function:
Home storage
Feature:
1.No tools to install 
2.Long life used in powder coated finish 
3.Shelevs adjustable
FAQ:

 Q1. Why Frameworkz ?
You don't have to purchase from our company, We know you could find any lower price in China.
However, if you purchase from us, you will get:

1.Cut out the middleman and drive down cost to provide lower prices to customer.
2.Talk with real manufacturer what you want.
3.As start company,all our products has been passed environmental protection.
4.Tell you how to avoid the dispute for the different markets.
5.Support ODM designs.
6.Get an high durable or much better products.
7.Always get the newest trend in our industry.

Q2: What is your delivery date?
A1. It's our normal production season, If order qty under 5000pcs:      
Standard products will be taken around 45days from order confirmation (or deposit paid).      
Customized products will be taken around 60days from order confirmation (or deposit paid).      
Over 5000pcs, There will be from 60days to 120days depend on actual qty , quality , article's construction etc.
A2. It's our peak production season, we'll take extra 15-20days base on standard leadtime.

Q3: How can you control your quality ?
A: Make the pre-production sample for physical properties evaluation.
B: Send PP sample or photos to customer for confirmation.
C:We complete QC system to control each production processing.        
D:Each item has its sole code from raw materials to final processing.          
E:We have guideline to workers for each production processing.        
F:Each workshop has QC conducts random draw and check. Over 20 years Retail Chain Supply experience, Clear know the EU / USA standard.    Work with qualified supplier, strict control the chemical composition.
E.   All the goods conducts final self-inspection before shipment.
 
 
 
Send your message to this supplier
Mrs. Rachel Lee

Post a Sourcing Request Now

People who liked this also liked